Skip to content
CMMC Guidance

Specimen. Northfield Precision Works is a fictional 80-person machining supplier and does not exist. Every figure below is illustrative, and nothing here is a client’s data or a promised outcome.

Back to the Method

Gap analysis

Northfield Precision Works

Period
Weeks 2–4
Context
Stage 02 of four

SPRS score at intake

-128

of a possible 110

32 of 110 requirements were met. The remaining 78 carry 238 points, which is what separates this environment from 110.

Met
32 requirements
Unmet
78 requirements
Points at risk
238

Where the points are

14 families

Ordered by points at risk rather than by family code, because that is the order the work gets done in.

FamilyMetPoints at risk
AC7 / 22
37
CM2 / 9
27
SI1 / 7
26
SC6 / 16
24
IA4 / 11
19
MP3 / 9
18
AU2 / 9
17
MA2 / 6
14
CA0 / 4
14
AT0 / 3
11
IR0 / 3
11
RA1 / 3
8
PE3 / 6
7
PS1 / 2
5

The findings costing the most

5 of 78

Each of these is a 5-point requirement under the DoD Assessment Methodology. Closing these five returns more score than closing thirty 1-point items.

  • IA3.5.3 · 5 points

    Multifactor authentication is not enforced

    Microsoft 365 has MFA for email. The shop-floor file server, the VPN, and every local administrator account do not, and those are the paths into the environment holding CUI.

    Remediation. Enforce MFA on the VPN and all privileged accounts before extending it to general users.

  • CM3.4.1 · 5 points

    No documented baseline configuration

    Workstations are imaged from a template last updated in 2023 and modified by hand since. There is no record of what a correct machine looks like, so no deviation can be detected.

    Remediation. Establish and document baselines for each system type, then bring the estate to them.

  • AU3.3.1 · 5 points

    Audit records are not created or retained

    The domain controller keeps default log sizes and rolls over in under two days. There is nothing to reconstruct an event from.

    Remediation. Centralise logging with retention that meets the requirement, then define what gets reviewed.

  • IR3.6.1 · 5 points

    No operational incident-handling capability

    There is no plan, no named responder, and no reporting path. The DFARS 72-hour clock has no owner.

    Remediation. Stand up the plan, name the roles, then exercise it so testing can be evidenced.

  • CA3.12.1 · 5 points

    Controls have never been assessed

    No periodic assessment has been performed, so nothing establishes whether the controls that do exist are effective.

    Remediation. Assess on a defined interval and record the result — this is also what feeds the POA&M.

Prepared by The CMMCg Method, stage 02. No engineer is named on a specimen. On a real engagement this is signed by the engineer who did the work, and it is the same person who answers the phone afterward.

A negative score is a sequencing problem, not a verdict.

Every finding here carries the points it costs, so the remediation order is arithmetic. This environment reached 110 in ten months by closing them heaviest first.

Talk to an engineer